Post-Construction Cleaning
on Long Island

Renovation complete? We remove fine construction dust and clean accessible surfaces, fixtures and floors. With HEPA construction vacuums and a plan matched to your project, we help you enjoy the work that’s just been finished.

$97 per cleaner-hour

Minimum team of two · Billed by total labor-hours
Discuss your project: (516) 699-8406
4.6 from 121 reviews
Empty room with wood flooring, white walls and a window

Detailed Cleaning After the Work Is Done

Fine dust can collect on ledges, trim and newly finished surfaces. We plan the cleaning around the areas affected by your renovation and the care those finishes need.

Construction Dust

  • Use HEPA construction vacuums to remove dust from suitable accessible surfaces
  • Wipe reachable ledges, doors, frames, switches, handles and trim
  • Clean accessible light fixtures, fan blades and vent covers within the agreed scope

Floors, Fixtures & Surfaces

  • Vacuum edges and suitable floor surfaces, then mop as appropriate for the material
  • Detail agreed kitchen and bathroom surfaces, fixtures and hardware
  • Assess light paint splatters, adhesive or grout haze before agreeing on residue removal

Details Matched to Your Project

  • Include cabinet and closet interiors when agreed in your quote
  • Plan interior window glass, sills and tracks around the areas that need attention
  • Request appliance interiors, extra rooms or other optional tasks before the visit

Your quote sets the scope. Tell us which areas were renovated and what cleanup the contractor has already completed. We confirm the tasks, access and optional extras before the visit.

Outside this service: heavy debris hauling, hazardous-material cleanup, internal HVAC duct cleaning, repairs and restoration. Contractors should remove construction waste first.

The Right Number of Visits for Your Renovation

Some projects need one visit. Others benefit from a second clean, depending on the work completed, dust remaining and the contractor’s cleanup.

Initial cleaning

Remove the construction dust

The first visit usually focuses on removing as much dust as possible with HEPA construction vacuums and careful surface cleaning. Air scrubbers are available when the project calls for them; not every job needs one.

Follow-up, when needed

Finish with a detailed clean

Dust may settle after the first visit. When a follow-up is recommended, we return for final construction-detail cleaning. We discuss the timing and scope with you; each planned visit is billed separately.

How labor-hour pricing works

We charge $97 for each cleaner’s hour and always send at least two cleaners. Add together the hours worked by everyone on the team to calculate the cleaning charge.

The time needed depends on your project’s size, condition and agreed tasks.

2 cleaners × 3 hours
= 6 labor-hours × $97
$582 for that visitPricing example only. Your project may need more or less time. A planned follow-up visit is charged separately.

Share the work completed, approximate area, remaining dust, surfaces and your preferred dates. We’ll help you plan the scope and discuss available appointments.

Photos from our team

A Closer Look at Our Cleaning Work

Company photos of floors, storage, stairs and bathroom surfaces. Select a photo to view the detail.

Tiled floor beside white doors and baseboards
Floors & baseboardsTiled flooring and white trim in an unfurnished space.
Empty built-in shelves behind open white doors
Shelves & storageEmpty built-in shelves and open cabinet doors.
Wood staircase with a white railing and pale walls
Stairs & railingsWood stair treads, a white railing and nearby trim.
White bathtub with a tiled surround and chrome fixtures
Bathroom surfacesA white bathtub, tiled surround and chrome fixtures.

Help Us Plan a Smooth Visit

Finish the dusty work

Arrange cleaning after construction work and heavy-debris removal. Tell us if trades will return so we can discuss how that affects the timing.

Keep work areas accessible

Plan cleaning before furniture moves into the finished areas. Tell us about belongings that will remain, access arrangements and new finishes that need specific care.

Share priorities and deadlines

Describe the rooms, residue and details that matter most. Photos can help us understand the project before we confirm the scope and available appointment times.

If your project date changes: Cancel or reschedule free with 48+ hours’ notice. With 24 to less than 48 hours’ notice, the fee is $50; with less than 24 hours, it is 50% of the agreed cleaning price. For hourly jobs, the percentage is based on the accepted estimate stated when booking. Contact us as soon as your contractor’s schedule changes.

Meet Your Cleaning Team

Maria, Long Island Maids team member
Maria
Jaime, Long Island Maids team member
Jaime

Experience with Renovation Cleanup

We’ve cleaned more than 200 renovation projects since launching in 2013. Tell us what work has been completed so we can plan the equipment, detail tasks and visits your project needs.

  • Construction-cleaning equipment. HEPA construction vacuums, with air scrubbers available when needed.
  • Clear communication. Discuss access, finishes and the agreed scope before the team arrives.
  • Insured and bonded. Learn more about our coverage and credentials.

Real Reviews

What Long Island Homeowners Say

Verified reviews from Google, updated in real-time.

4.6 • 121 reviews

Post-Construction Cleaning FAQs

Answers about labor-hours, dust removal, follow-up visits and preparing your space.

Call (516) 699-8406

View all FAQs
How much does post-construction cleaning cost?

Post-construction cleaning is $97 per cleaner-hour, with a minimum team of two cleaners. We charge by combined labor-hours: two cleaners working for three hours equals six labor-hours, or $582 for that visit. The time needed depends on the size, condition and agreed scope. Any planned follow-up cleaning visit is billed separately. Request a quote so we can discuss your project.

Do I need one cleaning visit or two?

That depends on the renovation, how much dust remains and how much cleanup your contractor has already completed. The first visit usually focuses on removing as much construction dust as possible. Dust may settle after that visit, so we may recommend a separately billed return for final detailed cleaning. We agree the number of visits and timing around your project; two visits are not required for every job.

When should I schedule cleaning after renovation work?

Schedule after dusty construction work is complete and the contractor has removed heavy debris and waste. Ideally, arrange cleaning before furniture moves into the finished areas. Tell us when the work will end and when you need the space ready so we can discuss availability and whether a follow-up visit is appropriate.

What should be ready before the cleaners arrive?

Have the contractor finish dusty work and remove heavy construction debris, packaging and waste. Keep the areas to be cleaned accessible and clear of belongings. Tell us about any furniture that will remain, access arrangements, new or delicate finishes and unfinished work before the appointment so we can confirm the scope.

Are cabinet interiors, interior windows and appliances included?

Your quote confirms the areas and tasks included in your construction clean. Cabinet and closet interiors, interior window glass and appliance interiors can be included when agreed in the scope. Optional extras can be requested with any of our cleaning services at additional cost. Tell us which rooms, appliances and interior spaces need attention before booking; do not assume the moving-clean bundle automatically applies to post-construction work.

Do you use HEPA vacuums and air scrubbers?

Yes. We use HEPA construction vacuums for renovation dust that requires construction-cleaning equipment. Air scrubbers are available when the project calls for them; not every job needs one. We discuss the approach for your space rather than promising the same equipment setup for every renovation.

Can you remove paint splatters, adhesive or grout haze?

We assess the residue and the surface before confirming what can be addressed. Light residue may be included where suitable for the material and finish; removal is not guaranteed. Heavy paint removal, damaged finishes or restoration work should be discussed with your contractor. Share these details before the visit so we can plan the scope.

Do you clean HVAC ducts or remove construction waste?

Internal HVAC duct cleaning, heavy debris hauling and hazardous-material cleanup are outside this service. Accessible vent covers and registers can be cleaned as part of the agreed surface cleaning. Your contractor should remove construction waste before the team arrives.

How long will my construction clean take?

The time depends on the size of the affected areas, work completed, remaining dust, contractor cleanup and the detail tasks you request. Tell us about the project and any deadline when requesting a quote. We will discuss the expected work and scheduling; we do not promise a fixed turnaround for every renovation.

What happens if an area was missed?

Report a missed or concerning area within 24 hours by phone, text or email and send photos. Our re-clean addresses affected areas within the completed, booked cleaning scope; it is not another cleaning of the entire home or a substitute for a separately planned construction-detail visit. We aim to return as soon as possible and within the same week, subject to availability. Refunds are not offered in place of a re-clean.

Renovation Finished? Let’s Plan the Cleaning.

Tell us about the work completed and the areas that need attention. We’ll help you plan the cleaning scope and available dates.

$97 per cleaner-hour · Minimum team of two · Serving Long Island

Discuss your project: (516) 699-8406

Cleaning photo

Use the previous and next buttons or arrow keys to browse. Press Escape or Close to return to the page.

1 of 4